West Hills Pool
Remodeling Project
This West Hills pool remodeling project upgraded an aging pool and spa with Pebble Tec pool plaster, new waterline tile, bullnose coping, ledger stone, plumbing upgrades, drainage improvements, LED lighting, electrical work, and a new paver pool deck.
Modernizing The Pool
For Safety & Style
The existing pool and spa needed a complete finish upgrade. The plaster was worn, the tile and coping were outdated, the plumbing needed modernization, and the surrounding deck required a safer, more durable surface.
- Replace worn pool plaster with a premium Pebble Tec finish.
- Upgrade waterline tile and bullnose coping.
- Modernize plumbing for better circulation and reliability.
- Improve drainage around the pool deck.
- Install a new paver pool deck with a refined finish.
Existing Pool
Before Remodeling
Before construction, the pool and spa had outdated finishes and needed improved plaster, coping, tile, deck surfaces, plumbing, drainage, and lighting.
Design Strategy
- Use Pebble Tec plaster to improve the pool interior finish.
- Use coping, tile, and ledger stone to create a more refined appearance.
- Upgrade plumbing, lighting, drainage, and pavers for long-term performance.
Scope Of Work
- Pool and spa remodeling
- Pebble Tec pool plaster installation.
- New waterline tile and bullnose coping.
- Ledger stone installation.
- Plumbing upgrades and drainage improvements.
- Paver pool deck installation
- Electrical improvements and LED light upgrades.
Pool Remodel
In Progress
The construction stage included demolition, plaster preparation, plumbing access, coping and tile preparation, drainage coordination, and pool deck paver installation.
Coping, Tile, Stone
& Pool Deck Details
These details show the upgraded coping, waterline tile, ledger stone, plumbing, and paver pool deck work that shaped the finished pool environment.
Premium Pool
Finishes & Systems
This project used upgraded pool finishes, hardscape materials, plumbing improvements, and deck surfaces to create a more durable and refined pool environment.
Project Investment
$70,000+
Final pricing depends on pool size, plaster selection, coping, tile, ledger stone, paver quantities, plumbing conditions, drainage scope, electrical work, and LED lighting upgrades.
Typical Timeline
4–6 Weeks
A pool and spa remodel of this scope typically moves through demolition, plumbing, drainage, tile, coping, plaster, pavers, lighting, equipment coordination, startup, and final walkthrough.
Completed West Hills
Pool Remodel
The completed pool and spa now feature a refreshed plaster finish, new coping, upgraded tile, ledger stone accents, improved systems, and a modern paver pool deck.
A Safer, Cleaner
Pool & Spa Upgrade
- Pebble Tec plaster created a premium pool interior finish.
- New bullnose coping improved the pool edge and safety.
- Waterline tile and ledger stone upgraded the overall appearance.
- Plumbing and drainage improvements supported long-term performance.
- Paver pool deck created a more refined and usable patio surface.
What The
Homeowner Said
“Build Up Remodeling did an incredible job remodeling our pool and spa. They helped us select finishes that completely transformed the space while maintaining safety and long-term durability. The new Pebble Tec plaster, tile, coping, and deck exceeded our expectations.”
— Mikhael M., West Hills Homeowner Read Full Yelp ReviewReady To Upgrade
Your Pool & Spa?
Build Up Remodeling remodels pools and spas throughout Los Angeles, including plaster, tile, coping, pavers, ledger stone, plumbing, drainage, lighting, electrical, and complete outdoor living upgrades.
Build Up Remodeling Inc. | CA License #1121460Book Your Free Consultation Back To Recent Projects
The Build Up Remodeling 3-Zone System™
Use our 3-Zone System™ to organize outdoor spaces around arrival, living, and activity — from pool deck circulation to spa lounging and family recreation.