Completed new in-ground swimming pool spa and paver deck project in Pasadena California by Build Up Remodeling
Completed Project · Pasadena, California

New In-Ground Pool & Spa + Paver Deck Installation

A complete Pasadena backyard transformation combining a new in-ground swimming pool and spa, raised patio, block-wall construction, Paseo paver decking, Cobble walkways, premium pool finishes, PVC plumbing, and site drainage.

$200K Project Range 8–10 Week Timeline New Pool + Spa Paver Deck + Walkways
Location Pasadena, CA
Project Investment $200K Range
Timeline 8–10 Weeks
Project Type Pool + Spa + Hardscape
Project Overview

A new pool designed as part of the entire backyard.

This Pasadena property needed more than a new swimming pool. The pool, spa, deck, raised patio, walkways, steps, walls, plumbing, and drainage all needed to work together.

Paseo 1 and Paseo 2 pavers establish the primary pool-deck and patio surfaces, while Cobble 1 and Cobble 2 pavers define the walkways. Bellacarte coping, NPT glass tile, and Mini Pebble plaster complete the pool finish package.

Beneath the finished hardscape, PVC pool plumbing and a dedicated PVC drainage system were coordinated before the final pavers and pool finishes were installed.

01 New Pool & Spa

New in-ground pool and integrated spa with premium coping, glass tile, and Mini Pebble finish.

02 Raised Patio

Elevated patio area supported by new block-wall construction and coordinated step transitions.

03 Premium Pavers

Paseo deck pavers combined with Cobble walkway pavers for visual separation and circulation.

04 Underground Systems

PVC pool plumbing and site drainage installed beneath the finished hardscape.

Before Photos

Before the transformation.

The existing property required a complete reorganization of the pool area, deck, walkways, circulation, and raised-patio zone.

Design Challenges

One backyard. Multiple elevations and systems.

The visible finishes were only one part of the project. Elevations, drainage, plumbing, wall construction, hardscape transitions, and pool finishes all needed to be coordinated as one build.

01

Raised Patio Integration

The raised patio required new block-wall construction, bullnose step edges, elevation planning, and clean transitions into the surrounding paver deck.

02

Paver Transitions

Paseo pavers and Cobble pavers needed consistent elevations while still visually defining the pool deck, walkways, and patio areas.

03

Underground Infrastructure

Pool plumbing and site drainage had to be installed, tested, and coordinated before hardscape and pool finish work could be completed.

Construction Progress

The work beneath the finished project.

Base preparation, elevation control, wall construction, pool infrastructure, plumbing, drainage, and hardscape preparation established the foundation for the final design.

Hardscape Installation

Paseo deck pavers. Cobble walkways.

Paseo pavers were selected for the primary pool-deck and raised-patio surfaces. Cobble pavers create a distinct walkway system connecting the outdoor areas.

Pool Finish Details

Coping, tile, plaster, and finishing details.

Bellacarte coping, NPT glass tile, Mini Pebble plaster, and the pool skimmer complete the visible and functional pool finish package.

Materials Used

Selected for this Pasadena project

  • Paseo 1 + Paseo 2 pavers — pool deck and raised patio
  • Cobble 1 + Cobble 2 pavers — walkways
  • Bellacarte pool coping
  • Mini Pebble interior pool plaster
  • NPT glass waterline tile
  • Block wall for raised patio
  • Bullnose edge detail for steps
  • PVC pool plumbing
  • PVC drainage system
Scope of Work

From site preparation to final finish

  • New in-ground swimming pool construction
  • Integrated spa construction
  • Excavation and site preparation
  • Pool plumbing and skimmer installation
  • PVC site drainage
  • Raised patio and block-wall construction
  • Bullnose step-edge construction
  • Paver base preparation
  • Paseo pool-deck paver installation
  • Cobble walkway installation
  • Coping, NPT glass tile, and Mini Pebble plaster
  • Final grading and cleanup
Exclusive Design Method

The 3-Zone System™

The 3-Zone System™ helps us think beyond individual features. It organizes an outdoor property around arrival, everyday living, and activity so the finished space feels connected rather than pieced together.

Learn About the 3-Zone System™ →
01

Arrival Zone™

Cobble paver walkways create intentional circulation through the property and establish clear transitions between outdoor areas.

02

Living Zone™

The raised patio creates a dedicated outdoor destination with its own elevation, paver surface, and direct relationship to the pool environment.

03

Activity Zone™

The new pool and spa anchor the recreational side of the project, surrounded by deck space for movement, swimming, and relaxation.

Project Investment & Timeline

Project planning at a glance.

These figures reflect this specific Pasadena project. Similar projects vary based on property conditions, permits, engineering, access, material selections, pool size, and total construction scope.

Project Range $200K

New pool, spa, hardscape, raised patio, walkways, walls, plumbing, drainage, and finish work.

Construction Timeline 8–10 Weeks

Includes structural work, underground systems, paver installation, pool finishes, and final detailing.

Project Type Complete Pool Environment

Pool, spa, raised patio, hardscape, walkways, plumbing, drainage, coping, tile, and plaster.

After Photos

The completed Pasadena pool and outdoor environment.

The finished project connects the pool, spa, Paseo deck pavers, Cobble walkways, Bellacarte coping, glass tile, Mini Pebble finish, and surrounding circulation into one complete backyard.

Completed Pasadena new in-ground pool spa and paver deck
Completed Pool, Spa & Paver Deck
Finished Pasadena pool and outdoor environment
Finished Outdoor Environment
Pasadena Project FAQ

Questions about projects like this one.

These answers describe this Pasadena case study and provide general planning context. Pricing, permits, timelines, and specifications vary by property.

What was included in this Pasadena pool and spa project?

The project included a new in-ground swimming pool, integrated spa, Paseo paver pool deck, Cobble paver walkways, raised patio, block-wall construction, Bellacarte coping, NPT glass tile, Mini Pebble plaster, PVC pool plumbing, skimmer installation, PVC drainage, step transitions, and associated site work.

What was the investment range for this Pasadena project?

The project was completed in approximately the $200,000 range. Similar projects may be higher or lower depending on pool size, property access, engineering, permitting, hardscape quantity, finish selections, and site conditions.

How long did the project take?

The construction timeline was approximately 8–10 weeks. Future project schedules depend on permitting, inspections, site conditions, material availability, engineering, weather, and total scope.

Which pavers were used around the pool and walkways?

Paseo 1 and Paseo 2 pavers were used for the primary pool-deck and raised-patio surfaces. Cobble 1 and Cobble 2 pavers were used for the walkways.

Which pool finishes were used?

The project includes Bellacarte coping, NPT glass waterline tile, and Mini Pebble plaster.

Did the project include new pool plumbing and drainage?

Yes. The project included PVC pool plumbing and a PVC site drainage system coordinated beneath the finished pool deck, patio, and walkways.

Build Up Remodeling

Planning a new pool, spa, and outdoor living project?

Tell us about your property, design goals, preferred features, and investment range. Our design-build team can help you plan the complete project before construction begins.